Railway's website preview

Well Run profileThe Chase Pack · #482 of 720

Position 482

Railway

Cloud platform that deploys apps, databases and agents from code in seconds, on its own servers

Pace
5:20/kmSteady2.25
Distance
Distance Half.
Open ops roles
—
Last week
#417
Move
▼ 65
Peak
#417
Weeks in the 100
0
The Chart →
Rank and score over time
Board rank
#407#442#476#417Oct 18#466Oct 25
Pace score
02462.3Oct 182.3Oct 25

One point per Sunday re-rank, tracking since Oct 18. The lines fill in week by week.

Railway runs in the Steady lane (5:20/km): 116 of 196. Further right = more momentum. No competitors on the board yet, so it runs alone.
Total raised
~$124M (CB Insights)see rounds ↓
Founded
2020
HQ
San Francisco, CA

Leadership

The problem

Shipping software to production means wrestling Docker, Kubernetes and hyperscaler setup instead of building the product

What they do

Cloud platform that deploys apps, databases and agents from code in seconds, on its own servers

Traction ~$20M → ~$100M ARR in 2026 (investor-reported); 3M users, ~100K signups/week, 25K paying businesses

Hiring trend

Open roles
7
Headcount
~35-40

Growing lean: ~35 staff (May 2026) → ~40 (Oct 2026); 7 open roles, all engineering, several evergreen since 2024-25

Hiring in

  • Remote (Global)
  • Remote (US)

Funding

Last round
$100M
Stage
Series B
Date
Jan 2026

Led by TQ Ventures (with FPV Ventures, Redpoint, Unusual Ventures)

Distance

Half · edge: cheaper at size

A leading Heroku successor with broad adoption (3M users, ~$100M ARR) and a real cost edge from owning its servers (~70% margins on its metal), but Vercel, Render, Fly and the hyperscalers are bigger or close, and 2026 outages plus a control plane that still leaned on Google Cloud are live exposure.

Sources: Latent Space: Jake Cooper on 3M users, own-metal data centers, ~70% margins (May 2026) ↗ · ARR Club: Railway grew from $20M to ~$100M ARR in 2026, ~40 people (Oct 2026) ↗ · TechTarget: Railway has 100,000 paid users at 25,000 businesses (Jan 2026) ↗

Watch-outs

Reliability crisis in 2026: repeated incidents (Jan, Feb DDoS, Mar 30 CDN cached logged-in users' data, Jul 2 US East outage) and an 8-hour platform-wide outage on May 19 after Google Cloud suspended its account; April PocketOS episode, where an AI agent's single API call wiped a production volume and its same-volume backups, drew wide criticism of Railway's API and backup design (Railway restored the data). Not scored: no layoffs found; Series A to B gap was ~44 months (May 2022 → Jan 2026), which caps traction at 'some' under the slow-gap rule.

Sources: Railway: Incident report, May 19, 2026 GCP account suspension (~8h platform-wide outage) ↗ · The Register: Google Cloud suspended Railway without cause, causing outage (May 2026) ↗ · InfoQ: GCP suspension caused eight-hour outage; Feb postmortem cited cascading failures (May 2026) ↗ · Railway: Incident report, Feb 18-21 DDoS + Cloudflare outage ↗ · Railway: Incident report, Mar 30, 2026, authenticated user data cached ↗ · Railway: Incident report, Jul 2, 2026 US East outage ↗ · heise: AI agent deletes PocketOS data on Railway, backups stored in same volume (May 2026) ↗

Open ops roles

No ops roles open right now

Last checked Oct 25, 2026

Funding historyTotal raised ~$124M (CB Insights)

  1. Jan 2026Series B$100MLed by TQ Ventures prnewswire.com ↗
  2. May 2022Series A$20MLed by Redpoint app.dealroom.co ↗
  3. SeedLed by Unusual Ventures unusual.vc ↗

Profile facts checked Oct 19, 2026. Every fact links to its public source.

Keep going

← Back to the board